ENGINEERING
2 x 240m2 sintering waste heat boiler project of a company
The waste heat from the high temperature waste gas of the sintering machine and the cooling machine is recycled, and the low-pressure steam is produced by the waste heat boiler to generate electricity from the turbogenerator. The outlet of the boiler high-pressure steam flow is more than 32 t/h; low-pressure steam flow is greater than or equal to 6.5 t/h. The process can ensure a high exhaust gas temperature, and exhaust gas-recycling component of the two section of the annular cooler; the impact on the cooling function and efficiency is minimal.
末成年毛片在线播放,国产青草视频在线观看,午夜福利体验试看120秒,最新无码国产在线视频2021